After the 24-hour period elapsed, the engineers returned to the site to initiate the evacuation process. They connected our vacuum pump to the systems, attached a torr gauge, and activated the pump until the system reached below 2 torr to eliminate any moisture from the pipework.
Following the completion of the evacuation process, the engineers introduced the new refrigerant into the system and conducted commissioning tests, along with finishing all necessary documentation.