Delivery of the project involved close collaboration with suppliers, structural engineers, and stadium facilities management. The installation phase included custom mounting solutions, pipework modifications, and integration with the building management system (BMS) to allow for real-time monitoring and control.
Commissioning was completed over two weeks, during which the new pumps were tested under various load conditions to ensure optimal performance. Our engineers provided on-site training for the stadium’s maintenance team and handed over detailed documentation to support ongoing operation and servicing.
The benefits to the customer were immediate and measurable. The new pump system reduced energy consumption by approximately one-third, contributing to lower operational costs and a smaller carbon footprint. In addition to improved efficiency, the stadium gained a more reliable and responsive system, reducing the risk of downtime during events. The upgrade also aligned with the stadium’s sustainability goals and regulatory compliance requirements, positioning them for future energy audits and certifications. Overall, the project delivered long-term value through enhanced performance, reduced maintenance, and significant energy savings.