Replacement and relocation of water pressure boosters and associated pipework. We incorporated new boosters into the existing BMS, did some relocation and installed new pipework. We installed all the necessary external aluminium cladding and rockwool insulation along with weather sealing.
We constantly work with our clients on long term planned preventative maintenance programs to ensure financial and budgetary stability, alongside consistency of system performance...
The split type air conditioning system had failed and required a full replacement. With the office being left unheated when the system failed there needed to have a very quick turnaround or employees could not work from that office.
The compressor on the VRF system feeding the fifth floor of the building failed and had to be replaced. This left the entire floor with no heating or cooling.
The NHS unit required an eco-friendly and cost-efficient heating system that would lead to greatly reduced Carbon emissions for the site. B-Eco installed two air source heat pumps, buffer vessel, all associated pipework and bespoke change over system. A new BMS system was installed and the air pump incorporated in…