Category: B-mech Projects

Royal Sun Alliance (Chelmsford)

Boiler plant room strip out and refit with three Remeha boilers and prefabricated header and reverse return. Strip out of all steam pipework, generator, compressor and water softener. Installation of all new screwed steel pipework with welded sections. Primary and secondary circuit connection and installation of expansion valves and new…

Croft School

This project was a full turnkey heating system replacement. Strip and refit of new plantroom, installation of two Stratton Mk 2 boilers. New gas pipework installed including prefabricated welded header. Design and fitting of new zoned heating distribution system, including ceiling storage panels and all associated pipework. Replacement of existing…

Mitras Paint Operations (Winsford)

Fitting of three gas fired, high level, warm air heaters and five destratification fans to recirculate warm air back to working level. We supplied and fitted new high-level brackets and pipework. Following the installation we carried out full commissioning of the installation and system. This was an extension of a…