NHS Green Lane Hospital (Devises) January 2022

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

Project Brief

“Saving Carbon whilst others save lives”

The NHS unit required an eco-friendly and cost-efficient heating system that would lead to greatly reduced Carbon emissions for the site. B-Eco installed two air source heat pumps, buffer vessel, all associated pipework and bespoke change over system. A new BMS system was installed and the air pump incorporated in the system. We were also responsible for all ground works, ducting fabrication and installation, aluminium cladding and weather sealing for a true turn-key project.

This project was bespoke to the site in order to integrate the existing gas fired heating system with low carbon emission air source heat pumps. The heat pump system works at a lower temperature so the heat pumps will operate for the majority of the year with the gas boilers topping up the system I the very cold periods. They system is fully automatic and requires minimal maintenance.

Other Case Studies you might be interested in